feedthroughs and cryostats
April 2002

A few pictures of feedthroughs and cryostats taken in building 180, CERN, 13 April 2002.


Endcap signal feedthroughs in their crates.

The barrel cryostat with all its signal feedthroughs installed (last one on April 5th 2002).

The endcap cryostat C still in its transport craddle.

The endcap cryostat C still in its transport craddle.

Close-up on the endcap cryostat showing some feedthrough ports and the SIMIC company logo.

Close-up on one barrel cryostat feedthrough showing the heater power wires.