Minutes of the UVic Testbeam meeting held Friday, September 24, 2004
(present: TH, RK, ML, IG, AAgrewal, WS, PP, TI)

Ashok can now compile checked-out code against the athena release(8.6.0) installed at UVic. He reported that there are some problems running due to calibration files being stored in peoples private space on CERN afs. Michel commented that this should not be the case and the eventually all these things should reside in a run tagged database.[It turned out that these files were related to the muon detector. After discussions with Michel Ashok agreed that oen should only use the TBH6* jobOption file to test the code.]

Warren gave us a progress report.

Tayfun has been in contact with people at Grenoble (Solveig Albrand, software engineer) to setup a mysql database for the run information now contained in the eLogbook. He has formulated the properties that will go with each run.  Said people have agreed to create the database as soon as possible.

Tamara has begun write he thesis. She is continuing to write software for the beam energy independant weights.

Ian has been in contact with Margret at cern and is working on compiling code produced by Pavol for Geant 4 testbeam simulation. Once compilation is successful he will begin integrating Margret's and his work with Pavol's. Locally he has installed Geant 4.6.2 in the /net/cern/ path visible from the fate machines.

Michel commented that we need to consider where to put the data files from this year.