Rob
explained to us that a lot of changes happened recently in the software
and lots of problems occurred in the wake, but things are starting to
run again.
All detector description has been moved to GeoModel now.
Rob has prepared OFC's based on pulse-shapes generated by Monika
and Manuella.
There has been a bit a snafu with the pedestals: Monika had done
a very careful job with the pedestals for Run1. While trying to
do the same job for run2, Monika's results were accidentally erased
and it took quite a while to recover them from a backup.
The database containing the pedestals now has a tag, so that
this won't happen any more.
One of the next things on the agenda is to look at the EMEC calibration.
Rob has received some code for H8 from Sandrine, which he
want to apply to our H6 setup. There is a good chance that
the uniformities observed by Warren are due to incorrect EMEC calibration.
Rob and Warren will be in contact on this.
Michel
listed the upcoming meetings for the remainder of the year and
urged us to consider which ones we think we should go to.