Minutes of feedthrough meeting of 2 April, 2002. ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ Present: Pof, FH, PB, AD, WW, ML *) Milestones: - final electrical tests finished on ft33 and ft34 - ft35 and ft36 were both cabled and welded; ft35 was also cold tested - six flanges were welded, and a 7-row pincarrier was replaced in warm flange 043 (the original had developed a leak after welding) *) ft36, our fifth HEC, will be shipped to CERN as soon as it is finished. ft37, the next to build, is to be a Special. *) Version 5 of the QA/QC document has been frozen and converted to PDF, and will be placed on EDMS before the upcoming LARG/ASSO week. *) Pof and Michel will prepare a short (~5) set of slides for the upcoming LARG/ASSO week. The ASSO is scheduled for Monday 15 April. *) Pof phoned Bob Hackenburg at BNL to remind him to please send a sample RTD so that we may examine how the RJ11 connections were done. *) Aaron estimates that we will have enough pincarriers leak checked and cold cycled to finish all 55 feedthroughs before the end of April. After that, we will continue cycling and testing all remaining pincarriers, but at a lower priority. Agenda for next week ^^^^^^^^^^^^^^^^^^^^ - Milestones - Plans for the week - pigtail stock - AOB