Feedthrough meeting September 7, 1999 present: AD,TH,RL,GV,PP,PB,MF,RK 1. Comments from RK The ATLAS NSERC review will be on January 9, 2000. The final text for this years grant will be needed by September 16. 2. Business arising from last meeting. BERG is preparing a reply to our tender request. Terry will check why the pin carriers are late. Roy is finalizing height of the vacuum tube (gland) on the warm flange. 3. Mark has produced a schematic of the feedthrough with vacuum cables and pigtails. He has questions about: - showing the insulation inside the bellows - Part numbers for cables - how to show heating resistors He has started a second set of drawings showing the steps of the assembly. This will complete the drawings. 4. Paul P discussed the interaction of theelectrical tests and the mechanical, vacuum and thermal tests. A decision was made to weld the cold funnel assembly to the cold flange; weld the bellows to the cold and warm flange all at the same time. A vacuum test of the cold funnel would be made immediately in ambient conditions. The FT would then be transferred to the cold testing station. 5. Paul B. showed a fairly advanced FT -1 plan. He has agreed to send RK a postscript file that RKK will make available. 6. Next agenda 10:00 AM Monday September 13. 1. ML drawings 2. PP/PB/MF presentation of planning group results to date 3. TH TIS and QA plan status