ecc integration June 2003
A few pictures of the endcap cryostat C integration on 16 June 2003, provided by Roy Langstaff.
The endcap cryostat C sealed to the cleanroom curtain ready for detector integration
|
One can see the lower half of the presampler mounted on the inner cryostat wall
| |