ecc integration
June 2003

A few pictures of the endcap cryostat C integration on 16 June 2003, provided by Roy Langstaff.  


The endcap cryostat C sealed to the cleanroom curtain ready for detector integration

One can see the lower half of the presampler mounted on the inner cryostat wall