endcap cryostat C installation December 2005
Pictures of the LAr endcap cryostat C installation in the pit, 2005/12/13
Photos taken by Thomas Hott.
"Dear Colleagues,
I am very glad to tell you LAr End Cap C is now installed and aligned
inside the Tile Extended Barrel C. Also the LAr lifting jig (T3) has
been removed safely in the meanwhile.
My congratulations and sincere thanks to all involved!"
| |