picture gallery

Also have a look at the the feedthrough project picture gallery for more integration photos.

2005/12/13 endcap cryostat C installation and feedthroughs
2005/12/13 endcap cryostat C installation
2005/11/14 atlas pit
2005/09/22 endcap cryostat C transport
2005/09/20 extended tile C transport
2005/02/09 closing endcap cryostat A
2004/11/03 LAr barrel calorimeter installation
2004/10/27 barrel cryostat transport
2004/10/20 first barrel toroid transport
2004/10/05 hec2 inside endcap cryostat A
2004/08/18 hec1 inside endcap cryostat A
2004/08/13 fcal activity in endcap cryostat C
2004/08/09 closing endcap cryostat C
2004/07/29 endcap cryostat A integration
2004/04/23 atlas pit
2003/12/08 endcap cryostat C with hec cabling
2003/11/25 hec and emec inside endcap cryostat C
2003/10/22 hec2 inside endcap cryostat C
2003/10/03 hec1 inside endcap cryostat C
2003/08/18 emec inside endcap cryostat C
2003/08/13 endcap cryostat C integration
2003/06/26 cryostats in building 180
2003/06/20 3d graphics of the endcap C
2003/06/16 endcap cryostat C integration
2003/03/14 atlas pit