endcap signal feedthrough reception tests at CERN
November 2001

The endcap signal feedthrough have started to arrive in CERN in October 2001. Here are a few pictures of the reception tests at CERN taken in November 2001.


First 4 HEC signal feedthroughs ready to leave UVic, 2 Nov 2001.

FCAL feedthrough unit undergoing electrical tests at CERN.

Four feedthrough units undergoing leak tests at CERN.

A feedthrough unit undergoing electrical tests at CERN.

View of the leak and electrical test equipment at CERN.

View of the leak test equipment at CERN.

View of the leak test equipment at CERN.

Endcap cryostat and feedthrough mockup at CERN.

Cross-talk tests on FT11 at CERN.

Greg jet-lagged at CERN.

Greg preparing a feedthrough for tests at CERN.

Close up on HEC pigtails.

John performing vacuum tests at CERN.

John working on HEC pigtails at CERN.

John jumpering HEC pigtails in preparation for tests at CERN.