First funnel cut
July 2002

The first endcap cryostat funnel cut was performed on July 19th 2002 at CERN in building 180. Pictures from Fiona.


Feedthrough and cutter setup.

Feedthrough and cutter setup.

Ready to cut.

First pass of the cutter.

During cutting.

Cut funnel.

The cut feedthrough
in the holder.

The feedthrough holder position,
near the endcap cryostat.