feedthroughs on endcap cryostat C installed
January 2003

All feedthroughs have been installed on ECC by Saturday January 25th 2003. Here are a few pistures from Fiona.  


A HEC feedthrough with an improved bucket for pigtail handling.

HEC feedthrough being craned into position.

HEC feedthrough craned into position.

HEC feedthrough being installed.

First quadrant feedthroughs, with the HEC feedthrough's pigtails in a bucket.

Endoscope check of the welds on a feedthrough on the second quadrant.

Third quadrant feedthroughs,with the HEC feedthrough's pigtails in a bucket.

Fourth quadrant feedthroughs,with the HEC and FCAL feedthrough's pigtails in a bucket.

First mounted pedestal!